Tower Crane Dismantling Method Statement

1. Project details

  • Project: Tower crane dismantling at [Project name / address]
  • Client: [Client name]
  • Contractor: [Contractor name]
  • Crane make/model/ID: [e.g., Liebherr 175 EC-B], SWL: [tonnes]
  • Dismantling date(s): [start — finish]
  • Prepared by: [Name], Date: April 10, 2026
  • Revision: 0

8. Post-Dismantling Close Out

  • Inspect all components for damage before transport.
  • Update site drawings (crane removed).
  • Debrief team: what went well, what to improve.
  • Dispose of oils/greases per environmental regulations.

Dismantling Methods

15. Inspections and documentation

  • Certificates for lifting gear, crane inspection reports, mobile crane setup checklists.
  • Permits to work, lift plans, RAMS and toolbox talk attendance sheets.
  • Record of weather checks and daily briefings.
  • Completion checklist and handover certificate on job completion.

To the casual observer, a tower crane is a marvel of assembly—a steel needle that rises floor by floor, seemingly by magic. But what goes up must, eventually, come down. If erecting a tower crane requires mathematical courage, dismantling it demands surgical precision. tower crane dismantling method statement