Guide to SRPS EN 13670: Execution of Concrete Structures
- Construction records: Records of the construction process, including the date and time of concrete placement, should be kept.
- Test reports: Reports of the tests carried out on the concrete should be prepared and maintained.
Purpose: It provides common requirements for the execution of concrete works to ensure they meet the design intent of Eurocode 2 (SRPS EN 1992). srps en 13670
All non-conformities must be documented, and corrective actions must be signed off by the designer or a competent engineer. Guide to SRPS EN 13670: Execution of Concrete Structures
Essentially, this standard specifies the requirements for the execution of concrete structures. It covers everything from the delivery of fresh concrete to the final finished structure, including formwork, reinforcement, concrete placement, compaction, curing, and geometrical tolerances. Construction records : Records of the construction process,
1. Purpose and Application
The primary purpose of this standard is to ensure that the finished structure meets the design requirements regarding safety, serviceability, and durability.