top of page

Eplan Electric P8 Plc4me New -
This report is written as if for an automation engineering team lead or technical manager evaluating the latest workflows.
Here is the new process:
- In the PLC Navigator, expand the PLC tree to see DI (Digital Inputs) and DO (Digital Outputs).
- Method A (Drag and Drop): Drag a sensor from your schematic -> Drop it onto an Input channel in the PLC Navigator. EPLAN automatically updates the cross-referencing.
- Method B (Manual): Open a sensor properties in the schematic -> Go to the "PLC Connection point" tab -> Manually type the address (e.g.,
%I0.0).
Introduction to ePlan Electric P8
: Available in higher-tier versions (Professional), this allows for tracking and reporting changes made during the project cycle. Benefits of Automated Reporting Time Efficiency eplan electric p8 plc4me new
- EPLAN Electric P8: Installed and licensed.
- Master Data: Ensure you have the macro libraries for the PLC brands you use (Siemens, Rockwell, Beckhoff, WAGO, etc.).
bottom of page